logohamburger menu
logo

Home

About

Projects

Services

Contact

info@forthermon.com

+234 1234 5678 1902

CNF - Robust Cashew Nut Factory

About this project

This project involves the turnkey development of a comprehensive, fully integrated industrial complex engineered to support high-capacity manufacturing, processing, and logistics operations.The core of the facility features a 10,000 sqm heavy-duty manufacturing factory optimized for equipment installation and workflow efficiency, alongside a specialized CNSL extraction factory and a 7,000 sqm high-clearance, clear-span warehouse designed for optimal inventory management. To ensure weather-protected, secure goods transfer and efficient site operations, the warehouse includes an integrated unloading bay and a connecting vestibule shield, supported by 4 logistics loading bays for rapid, high-volume shipping and receiving. The complex is further complemented by dedicated on-site administrative and accommodation buildings to support operational staff, as well as complete electrical infrastructure (HV/LV distribution, substations, backup power, industrial lighting) and mechanical systems (specialized HVAC, industrial ventilation, compressed air, and fire suppression).Ground stabilization and site boundary security are reinforced by extensive land filling, compaction, and an engineered retaining wall, vital for ensuring stable, secure site topography. Site runoff and flood mitigation are effectively managed through comprehensive drainage and canal civil infrastructure spanning 1.2 km. Internal logistics and heavy vehicular traffic are facilitated by a 1.5 km heavy-duty, reinforced rigid pavement concrete road network built within the facility, specifically designed to withstand continuous freight traffic and high axle loads.

  • Total Footprint: Turnkey industrial complex featuring a 10,000 sqm manufacturing factory, 7,000 sqm clear-span warehouse, CNSL extraction factory, administrative facilities, and staff accommodation building
  • Primary Facility: High-capacity production and processing complex with an integrated warehouse, 4 loading bays, unloading bay, and connecting vestibule shield
  • Civil Engineering: Extensive land filling & compaction, engineered retaining wall, and 1.2 km of drainage and canal works for flood mitigation
  • Logistics & Access: 1.5 km heavy-duty reinforced rigid pavement concrete road network designed for continuous freight traffic
CNF - Robust Cashew Nut Factory
image 11
image 10
image 9
image 8
image 7
image 6
image 5
image 4
image 3
image 2
image 1

Fort Hermon Limited (FHL) was founded to deliver high-value engineering solutions for civil infrastructure and related industries.We are a specialized engineering firm offering comprehensive Construction, Project Management, and Specialized Engineering Services.

Contact Info

Second Floor Left Wing
Plot 1668B Oyin Jolayemi Street,
Victoria Island Lagos.

info@forthermon.com

+234 803 547 0396

© Copyright 2026 All Rights Reserved.

Terms | Privacy