
JWH - Ota Warehouse
About this project
This project involves the strategic development of a streamlined logistics and distribution hub engineered to support high-volume truck movement, rapid freight handling, and efficient fleet staging.The core of the facility features an 8,000 sqm clear-span warehouse, optimized for modern racking configurations, high-density inventory management, and rapid loading operations. To ensure seamless site operations and eliminate bottlenecks during peak movement, the hub incorporates a dedicated trailer park staging area alongside a dedicated access road network connecting the public highway to facility gates.Internal logistics and heavy vehicular traffic are facilitated by a high-durability, reinforced rigid pavement concrete service road built within the facility, specifically designed to handle continuous high-axle truck movements, tight turning radii, and heavy freight wear.
- Total Footprint: Dedicated high-volume logistics and distribution hub featuring a large-scale warehouse, trailer staging yard, and dedicated highway access
- Primary Facility: 8,000 sqm clear-span storage and distribution facility
- Civil Engineering: Integrated entry/exit roadway network designed for tight turning radii and heavy freight wear
- Logistics & Access: Heavy-duty rigid pavement service road paired with a dedicated trailer park staging yard










Fort Hermon Limited (FHL) was founded to deliver high-value engineering solutions for civil infrastructure and related industries.We are a specialized engineering firm offering comprehensive Construction, Project Management, and Specialized Engineering Services.
© Copyright 2026 All Rights Reserved.
Terms | Privacy




