
AWK - Awokoya Road
About this project
This project comprised the full-depth reconstruction of a 2.0km major road corridor, expanded to a 14.0m-wide heavy-duty asphalt carriageway engineered to handle high traffic volumes and deliver long-term pavement durability.The core of the facility features a 2.0km alignment with a 14.0m-wide asphalt concrete surface, optimized for heavy load-bearing capacity and improved urban traffic flow. To ensure uninterrupted stormwater discharge and protect the road shoulder and sub-grade from erosion, precision hydraulic works—including reinforced concrete culverts at strategic low points—were executed along the corridor.Ground stabilization and runoff control were reinforced by continuous, high-capacity concrete line drains installed along the alignment, vital for capturing surface water and preserving structural integrity. Urban logistics and high-volume traffic are facilitated by a wide, heavy-duty asphalt roadway network built within the corridor, specifically designed to withstand dense traffic movement while minimizing long-term maintenance overhead.
- Total Footprint: 2.0km major urban corridor expanded to a 14.0m multi-lane carriageway
- Primary Facility: 2.0km x 14.0m heavy-duty asphalt concrete roadway
- Civil Engineering: Reinforced concrete culverts & continuous high-capacity line drains
- Logistics & Access: Wide-carriageway urban transport route engineered for high-volume traffic









Fort Hermon Limited (FHL) was founded to deliver high-value engineering solutions for civil infrastructure and related industries.We are a specialized engineering firm offering comprehensive Construction, Project Management, and Specialized Engineering Services.
© Copyright 2026 All Rights Reserved.
Terms | Privacy




